Watermain Rehabilitation Work in Rabbittown

Monday, April 01, 2019 - 3:30 PM

The watermain in the Rabbittown area is scheduled for cleaning and structural lining from April to August 2019. This is a continuation of the 2018 watermain lining project.

Businesses and homes will receive water through a temporary above ground water piping system installed along the street. The contractor will notify residents directly if their property is impacted. Access to properties is required to provide temporary water service.

Two-way traffic and pedestrian access will be maintained where possible. Every effort will be made to maintain driveway access to properties in the work site. Minor traffic delays are to be expected.

Please visit engagestjohns.ca under Capital Construction Projects for details, maps and street listings related to this project.

The Access St. John’s Call Centre is available to residents 24 hours a day, seven days a week, by calling 311 or 709-754-CITY (2489) or online.